The hole is drilled for the pole.

 

The antennas and cable are attached.

 

The crane moves into position.

 

The pole is lifted into position.

 

The pole is twisted so the antennas are aimed correctly.

 

Finishing touches are applied once the pole is set and dirt is packed.